Construction method for assembled building cantilevered element

A construction method and prefabricated technology, applied in building components, building structures, buildings, etc., can solve the problems of inconvenient construction site inspection, inspection access, difficulty in construction site, long construction period, etc., so as to save erection time and shorten construction period. , the effect of low cost

Active Publication Date: 2018-06-01
CHANGDA BUILDING MATERIAL CO LTD
View PDF5 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] At present, there are many problems in the vigorous development of prefabricated buildings. Among them, the prefabricated construction site is not as uniform, clean and environmentally friendly as expected. Among them, a large number of support systems are still required during the installation of prefabricated components of prefabricated buildings. Chaotic, especially the overhanging components of some prefabricated buildings combined with the traditional full frame support method, the construction site is still difficult for people to walk, and there is a big safety hazard
Of course, there is also an independent support system that came into being along with the prefabricated building, which makes the whole construction site much cleaner and fresher, but a large number of triangular supports also make it very inconvenient to inspect and check in and out of the construction site, and safety accidents often occur
[0005] In addition, the installation process of the prefabricated cantilever components of the existing prefabricated buildings is usually constructed gradually from the ground floor to the top floor of the building, which also leads to a long construction period.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for assembled building cantilevered element

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0029] Such as figure 1 As shown, a construction method of a prefabricated building cantilevered component includes the following steps:

[0030] (a) Construction preparation: determine the installation position of the cantilever component 1;

[0031] (b) Component hoisting: use lifting equipment (not shown in the figure) to hoist the cantilevered component 1 to the installation position, and a hand chain hoist (not shown in the figure) needs to be hung under the hook of the lifting equipment, which needs to be explained What is more, the hanging lug 11 is preset on the cantilever member 1, which...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for an assembled building cantilevered element, and belongs to the technical field of the assembled building. The construction method for the assembled building cantilevered element comprises the steps that the construction is prepared; the element is hoisted; a pendant-fitting is hanged, and the pendant-fitting is connected with the element; the elevation, verticality and levelness of the element is adjusted; a reserved steel bar of the element is fixed with a plate tendon; slab concrete is poured; and after the concrete reaches the design strength, the pendant-fitting is removed. The construction method for the assembled building cantilevered element is based on the steel mixing assembled structure system, without the need for using a traditional support system, the construction site is clean, neat, and unblocked, the construction period is short and the construction cost is low.

Description

technical field [0001] The invention belongs to the technical field of prefabricated buildings, in particular to a construction method for cantilevered components of prefabricated buildings. Background technique [0002] The mixed structure of steel structure and concrete is called steel-concrete hybrid structure. This structural form has the advantages of good seismic performance and strong integrity. [0003] In accordance with the requirements of promoting supply-side structural reform and new urbanization development, vigorously develop prefabricated buildings such as steel structures and concrete, which has multiple effects such as developing new energy-saving and environmental protection industries, improving building safety levels, and promoting the resolution of excess capacity. With the strong support of policy guidance, prefabricated buildings have gradually entered people's field of vision, and prefabricated buildings have lived up to everyone's expectations. Wit...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04B1/00E04G21/14
CPCE04B1/003E04G21/14E04G21/142
Inventor 张恒铭周克家李飞宁娜娜赵海成林萌李希文高云峰王树军魏新新
Owner CHANGDA BUILDING MATERIAL CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products