GIS-based landslide and mud-rock flow pre-warning system
An early warning system and debris flow technology, applied to alarms, instruments, etc., can solve problems such as poor targeting, achieve the effects of improving early warning, ensuring reliability, and reducing losses
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0018] A landslide and debris flow early warning system based on GIS. The early warning system includes a GIS platform, a wireless gateway, a monitoring device, a warning device, and an unmanned aerial vehicle system. The monitoring device is installed in the monitoring area, and the gateway is installed on the monitoring device. The monitoring device can be realized through the gateway. Data transmission with the monitoring platform, the UAV system includes the UAV and the camera, radar, gateway, and supplementary light installed on the UAV.
[0019] The number of said gateways is 2.
[0020] The number of the monitoring device is 1.
[0021] A positioning system is also installed on the monitoring device.
[0022] The monitoring device can realize water level monitoring and vibration monitoring.
[0023] The water level monitoring is divided into four grades of blue, yellow, orange, and red according to the water level, and the blue, yellow, orange, and red grades increase...
Embodiment 2
[0029] A landslide and debris flow early warning system based on GIS. The early warning system includes a GIS platform, a wireless gateway, a monitoring device, a warning device, and an unmanned aerial vehicle system. The monitoring device is installed in the monitoring area, and the gateway is installed on the monitoring device. The monitoring device can be realized through the gateway. Data transmission with the monitoring platform, the UAV system includes the UAV and the camera, radar, gateway, and supplementary light installed on the UAV.
[0030] The number of gateways is 7.
[0031] The number of the monitoring devices is 6.
[0032] A positioning system is also installed on the monitoring device.
[0033] The monitoring device can realize water level monitoring and vibration monitoring.
[0034] The water level monitoring is divided into four grades of blue, yellow, orange, and red according to the water level, and the blue, yellow, orange, and red grades increase seq...
Embodiment 3
[0040] A landslide and debris flow early warning system based on GIS. The early warning system includes a GIS platform, a wireless gateway, a monitoring device, a warning device, and an unmanned aerial vehicle system. The monitoring device is installed in the monitoring area, and the gateway is installed on the monitoring device. The monitoring device can be realized through the gateway. Data transmission with the monitoring platform, the UAV system includes the UAV and the camera, radar, gateway, and supplementary light installed on the UAV.
[0041] The number of gateways is 5.
[0042] The number of the monitoring devices is 4.
[0043] A positioning system is also installed on the monitoring device.
[0044] The monitoring device can realize water level monitoring and vibration monitoring.
[0045] The water level monitoring is divided into four grades of blue, yellow, orange, and red according to the water level, and the blue, yellow, orange, and red grades increase seq...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com