A processing method and floor technology, which can be applied to floors, buildings, building structures, etc., can solve the problems of low slip resistance of wear-resistant floors, and achieve the advantages of strengthening concrete strength, high anti-skid performance, and improving strength and service life. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0028] This embodiment provides a non-slip wear-resistant floor processing method, including the following steps,
[0029] (1) Concrete aggregate formwork pouring: According to the design elevation of the platform, formwork is poured in separate warehouses;
[0030] (2) Concrete smoothing and slurry extraction: After the base layer formed in step (1) has initially received water, start the trowel to grind and press the slurry at a slow speed, and then use a ruler to level it to make the surface basically even and smooth;
[0031] (3) Mortar fill-up: After the concrete treated in step (2) has received water, use 1:2 mortar to fill-up;
[0032] (4) Hardening of the base layer: After leveling, spray hardening materials, wear-resistant materials and anti-skid materials evenly on the surface of the base layer, and then lay protective cloth for protection. After the three materials to be sprayed absorb water, remove the protective cloth and use equipment Make it combine with the ba...
Embodiment 2
[0039] In this embodiment, the following optimizations are made on the basis of Embodiment 1: a method for processing an anti-skid and wear-resistant floor, comprising the following steps,
[0040] (1) Concrete aggregate formwork pouring: According to the design elevation of the platform, formwork is poured in separate warehouses;
[0041] (2) Concrete smoothing and slurry extraction: After the base layer formed in step (1) has initially received water, start the trowel to grind and press the slurry at a slow speed, and then use a ruler to level it to make the surface basically even and smooth;
[0042] (3) Mortar fill-up: After the concrete treated in step (2) has received water, use 1:2 mortar to fill-up;
[0043] (4) Hardening of the base layer: After leveling, spray hardening materials, wear-resistant materials and anti-skid materials evenly on the surface of the base layer, and then lay protective cloth for protection. After the three materials to be sprayed absorb water,...
Embodiment 3
[0050] In this embodiment, the following optimizations are made on the basis of Embodiment 1: a method for processing an anti-skid and wear-resistant floor, comprising the following steps,
[0051] (1) Concrete aggregate formwork pouring: According to the design elevation of the platform, formwork is poured in separate warehouses;
[0052] (2) Concrete smoothing and slurry extraction: After the base layer formed in step (1) has initially received water, start the trowel to grind and press the slurry at a slow speed, and then use a ruler to level it to make the surface basically even and smooth;
[0053] (3) Mortar fill-up: After the concrete treated in step (2) has received water, use 1:2 mortar to fill-up;
[0054] (4) Hardening of the base layer: After leveling, spray hardening materials, wear-resistant materials and anti-skid materials evenly on the surface of the base layer, and then lay protective cloth for protection. After the three materials to be sprayed absorb water,...
PUM
Property | Measurement | Unit |
---|---|---|
width | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com