Post-lifting reinforcement construction method for asphalt concrete pavement inspection well

A construction method and inspection well technology, applied in roads, roads, artificial islands, etc., can solve problems such as structural layer disturbances, achieve the effects of reducing collision noise, reducing maintenance costs, and improving driving comfort

Inactive Publication Date: 2018-06-29
WUHAN YIYE CONSTR ENG
View PDF8 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to provide a construction method for asphalt concrete pavement inspection wells, which solves the problem of disturbing the original pavement structure layer, and solves the problem that the manhole cover and the original road surface will be formed between the inspection well after the reinforcement. For a certain height difference, the color of the lifting base surface and the black road surface after the inspection well are coordinated

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Post-lifting reinforcement construction method for asphalt concrete pavement inspection well
  • Post-lifting reinforcement construction method for asphalt concrete pavement inspection well
  • Post-lifting reinforcement construction method for asphalt concrete pavement inspection well

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0030] A construction method for asphalt concrete pavement inspection well back-up reinforcement, comprising the steps of:

[0031] S1. Before asphalt paving on asphalt concrete pavement, count and mark inspection wells.

[0032] S2, such as figure 2 As shown, after asphalt paving on the asphalt concrete pavement, take the center of the manhole cover 5 as the center point, and take the diameter and length of the manhole cover 5 as the radius of the inscribed circle of the regular hexagon to make a regular hexagonal stakeout.

[0033] S3. First cut the side line of the regular hexagon (by cutting machine), and then chisel the asphalt and concrete within the regular hexagon to a certain depth (by pneumatic pick or electric pick).

[0034] In this embodiment, the chiseling depth is 30 cm below the road surface elevation.

[0035] In this embodiment, th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention aims to provide a post-lifting reinforcement construction method for an asphalt concrete pavement inspection well. The post-lifting reinforcement construction method comprises: carrying out regular hexagon setting-out with the center of a well lid as a center point and the diameter length of the well lid as the inscribed circle radius of the regular hexagon; cutting the sidelines of the regular hexagon; removing asphalt and concrete in the range of the regular hexagon to a certain depth; mounting an inspection well post-lifting base reinforcement cage in the pothole, with a plurality of adjusting bolts fixed to the inspection well post-lifting base reinforcement cage and a leveling steel plate mounted on the adjusting bolts; mounting an inspection well post-lifting base formwork in the inspection well; placing a well seat on the leveling steel plate, leveling the well seat by means of the adjusting bolts and the leveling steel plate and enabling the well seat toreach the elevation; pouring concrete to form an inspection well post-lifting base, and before initial setting of the concrete, spreading a layer of ordinary Portland cement on the surface of the concrete. This method solves the problem of a particular altitude difference between the well lid and the original pavement in the post-lifting reinforcement position of the inspection well, and achievescolor harmony of the surface of the inspection well post-lifting base with black pavement.

Description

technical field [0001] The invention belongs to the field of road construction, and in particular relates to a back-lifting reinforcement construction method for an inspection well on an asphalt concrete road surface. technical background [0002] In the construction of urban road reconstruction, the conventional method of lifting and transforming the inspection well is to pour the concrete base under the well seat first, and then lay the asphalt concrete surface course after installing the well seat and well cover. However, in actual construction, it has been found that the following problems exist in paving the asphalt concrete surface after lifting the inspection well first: 1) There will be a certain height difference between the manhole cover and the original road surface, which will not only cause certain obstacles to the mechanical paving operation , and after the entire pavement is painted black, the joint between the manhole cover and the asphalt surface layer is pr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D29/12E01C11/00
CPCE01C11/00E02D29/128
Inventor 黄轶方慧琴张婷婷赵海莲
Owner WUHAN YIYE CONSTR ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products