Hardware-in-loop testing requirement control method and system of BMS based on QC
A technology for testing requirements and control methods, applied in the direction of test/monitoring control systems, general control systems, control/regulation systems, etc., to achieve the effect of improving efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0043] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. All other embodiments obtained by persons of ordinary skill in the art based on the embodiments of the present invention belong to the protection scope of the present invention.
[0044] Such as figure 1 As shown, a QC-based hardware-in-the-loop test demand control method for a new energy vehicle battery management system according to an embodiment of the present invention includes the following steps:
[0045] S1 Entry of requirements and test cases;
[0046] S2 Management of test requirement relationship traceability relationship;
[0047] S3 test requirements and test case usage-to-quantity relationship management.
[0048] Further, the entry of the requirements ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

