Embedded sleeve structure used in shear wall and floor slab and construction method thereof
A construction method and shear wall technology, which is applied in the direction of formwork/formwork/work frame, building structure, and on-site preparation of building components, which can solve the problem of inability to guarantee the concrete strength and effective waterproofing of reserved openings or rear openings , messy layout of pipeline space, uncoordinated overall structure and other problems, to achieve the effect of good space location and favorable conditions, simple and practical structure, and standardized settings
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] Such as Figures 1 to 3 As shown, it is used for the embedded casing structure in the shear wall and the floor slab. The entire embedded casing structure is pre-embedded and installed in the shear wall and the floor slab 4, including the steel plate 1 and the steel casing 2, and the steel casing 2 is used When the subsequent pipeline passes through, the steel plate 1 is rectangular, and at least one through hole 3 is opened on the steel plate 1, the diameter of the through hole 3 is adapted to the outer diameter of the steel sleeve 2, and the steel sleeve 2 passes through the through hole 3, It is welded and fixed with the steel plate 1, welded for one week between the steel sleeve 2 and the steel plate 1, and three reinforcement plates 5 are welded and fixed between the steel sleeve 2 and the steel plate 1, and are evenly arranged along the circumferential direction of the steel sleeve 2 , the steel plate 1 is welded and fixed to the steel bars (not shown in the figure...
Embodiment 2
[0028] Such as Figure 4 with 5 As shown, on the basis of Example 1, the pre-embedded casing structure includes two parallel steel plates 1, both of which are rectangular, and the two steel plates 1 are fixed as a whole by connecting rods 6, and the connecting rods 6 and The two steel plates 1 are welded and fixed, there is an interval between the two steel plates 1, the size of the two steel plates 1 is the same, the size and position of the through holes 3 opened on the two steel plates 1 are correspondingly the same, and the same steel sleeve 2 passes through the two steel plates 1 correspondingly through-hole 3.
[0029] For the construction method of the pre-embedded casing structure in the shear wall and floor slab in embodiment 2, according to the design drawings, first determine the size and position of the steel plate 1 and the through hole 3 provided by the steel plate 1, and place it on the steel plate 1 on site Open the corresponding through hole 3, control the d...