[0085] Embodiment 1: This method of comprehensive renovation of the old residential area transforms a residential area consisting of 6 6-story brick-concrete residential buildings, and adds a floor of underground space to realize the steps as follows:
[0086] (1) Re-plan the layout and design drawings according to the current situation of the community;
[0087] (2) The structural plan of the single-story brick-concrete house and the plan of the strip foundation under the wall are attached. figure 1 , 2 , the upper body of wall 1 is located on the strip foundation 2 under the wall;
[0088] (3) Lay underpinning raft 3 under building 5 to underpin upper wall 1, see attached Figure 4 ; During the laying of the underpinning raft 3, the pile holes 4 for pouring the supporting piles 6 are reserved in advance, see the attached image 3 . If the internal walls of the building are particularly dense, and the reserved pile hole position cannot avoid the original wall position, a ...
Embodiment 2
[0100] Embodiment two: this kind of old community comprehensive transformation method, this old community comprehensive transformation method, transforms a community that is made up of 6 brick-concrete residential buildings with 6 floors, and adds three layers of underground space. The realization steps are as follows:
[0101] (1) Reasonably plan the layout and design drawings according to the current situation of the community;
[0102] (2) The structural plan of the single-story brick-concrete house and the plan of the strip foundation under the wall are attached. figure 1 , 2 , the upper body of wall 1 is located on the strip foundation 2 under the wall;
[0103] (3) Lay underpinning raft 3 under building 5 to underpin upper wall 1, see attached Figure 4 ; During the process of laying the underpinning raft 3, the pile holes 4 for pouring support piles are reserved in advance, see the attached image 3 . If the internal walls of the building are particularly dense, and...
Embodiment 3
[0110] Embodiment three: this old community comprehensive transformation method, transforms a community that is made up of 6 brick-concrete residential buildings with 6 floors, and adds two floors of underground space. The realization steps are as follows:
[0111] (1) Reasonably plan the layout and design drawings according to the current situation of the community;
[0112] (2) The structural plan of the single-story brick-concrete house and the plan of the strip foundation under the wall are attached. figure 1 , 2 , the upper body of wall 1 is located on the strip foundation 2 under the wall;
[0113] (3) Lay underpinning raft 3 under building 5 to underpin upper wall 1, see attached Figure 4 ; During the process of laying the underpinning raft 3, the pile holes 4 for pouring support piles are reserved in advance, see the attached image 3 . If the internal walls of the building are particularly dense, and the reserved pile hole position cannot avoid the original wall ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com