Construction method for earth pressure balance shield underneath crossing multi-track railway based on shallow buried soft soil layer

A technology of earth pressure balance shield tunneling and construction method, which is applied in the direction of earthwork drilling, tunnel, tunnel lining, etc., to achieve the effect of maintaining stability, controlling surface subsidence, and reducing ground subsidence value

Active Publication Date: 2018-09-28
中交中南工程局有限公司 +1
View PDF6 Cites 27 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to combine the engineering practice and the investigation of ground subsidence, adjacent building deformation and settlement and cracks during shield tunnel construction, and according to the monitoring experience of shield tunnel tunnel construction, to carry out targeted investigations on the problems encountered in the monitoring process and outside the procedure during the monitoring process. Analysis

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for earth pressure balance shield underneath crossing multi-track railway based on shallow buried soft soil layer
  • Construction method for earth pressure balance shield underneath crossing multi-track railway based on shallow buried soft soil layer
  • Construction method for earth pressure balance shield underneath crossing multi-track railway based on shallow buried soft soil layer

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0095] A method for controlling the excavation parameters of deep foundation pits of multi-strand subway subways in a complex environment and in a narrow space. The method includes the following steps:

[0096] S1 Construction preparation: It is determined that the construction geological condition of the tunnel passing through the building is poor, the surface environment is complex, and the ground where the ground is disturbed is relatively large. In order to ensure that the shield machine passes through to reduce groundwater loss, prevent over-excavation of the ground near the house, and reduce the impact on the ground buildings disturbance to ensure the safety of excavation.

[0097] (1) Equipment preparation;

[0098] Before the shield machine goes under the building, a comprehensive and detailed inspection is carried out on the shield machine and supporting equipment. Overhaul the grouting system, control circuit and hydraulic system of the shield machine, the brake sys...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction method for an earth pressure balance shield underneath crossing a multi-track railway based on a shallow buried soft soil layer, and belongs to the technical field of metro construction. The construction method comprises the following steps that construction preparation is conducted, specifically, the situations that the construction geological condition at asection of a tunnel underneath crossing a building is poor, the ground-surface environment is complex, disturbance of stratum where the tunnel is located is large are determined, in order to ensure that underground water loss is reduced during the period of passing of a shield machine, overbreak of stratums near a house is prevented, disturbance to ground buildings is reduced, and downward excavation safety is ensured; selecting and determining of test sections are conducted; segment grouting holes are additionally formed; segment reinforcement is reinforced; an advance exploratory drilling and grouting system is designed and additionally arranged on the shield machine; control measures of shield tunneling parameters are implemented; and a clay shock method is adopted for inhibiting settlement. Through the technique process, it is ensured that the whole construction technology is smooth and complete before excavation, during excavation and after excavation, and the construction quality is ensured.

Description

technical field [0001] The invention discloses an excavation parameter control method for multi-strand subway deep foundation pits in complex environments and narrow spaces, and belongs to the technical field of subway construction. Background technique [0002] In the process of subway construction, various construction environments are often encountered, especially in the face of some complex ground environments, narrow construction space, and simultaneous construction of multi-track subways, it is necessary to reasonably control the excavation parameters. [0003] Generally speaking, long-arm excavators are used to excavate deep foundation pits in layers, but the construction efficiency is low, the investment is large, and the site is required. In a limited space, it is necessary to formulate a reasonable and effective deep foundation pit excavation plan and construction technology. Contents of the invention [0004] The purpose of the present invention is to combine t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/06E21D9/08E21D9/093E21D11/10
Inventor 周思峰滕卓然邹中波刘勇于新山杜国涛余昌平
Owner 中交中南工程局有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products