A lifting equipment and building construction technology, applied in the direction of lifting equipment braking device, walking bridge crane, crane, etc., can solve problems such as uneconomical, affecting operation efficiency, and position adjustment that cannot be lifted, and achieve strong lifting bearing capacity. , Strengthen the lifting strength, easy to set up effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] The following will be combined with Figure 1-Figure 8 The present invention is described in detail, and the technical solutions in the embodiments of the present invention are clearly and completely described. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0037] The present invention provides a hoisting device used in building construction through improvement. As shown in the figure, the hoisting device has a steel support structure 1, and a beam structure 2 that moves on the steel support structure 1, and a beam structure 2 located on the beam structure 2 The mobile lifting trolley 3 in the upper movement;
[0038] The beam structure 2 includes two main beam blocks 4 and sliding bearings 5 ...