A multi-agent, planning technology, applied in the direction of resources, data processing applications, instruments, etc., can solve the problems of reducing market vitality, unable to reflect the actual incremental distribution network market operation mechanism, and unable to take into account the interests of investors.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0162] 1. Parameter setting
[0163] In this embodiment, the modified IEEE33 node distribution network system is selected as a calculation example for simulation analysis, and its structure is as follows Image 6 shown. The system includes 37 branches, the total load is 3715kW+2700kvar, and the reference voltage is 12.66kV.
[0164] DG is considered to be photovoltaic power generation, and the candidate access locations of photovoltaic power generation are {7, 20, 24, 32}. Other relevant parameters are shown in Table 1.
[0165] Table 1 DG related parameters
[0166] DG unit capacity investment cost (10,000 yuan / kW) 1 DG single rated capacity / kW 50 DG unit electricity sales price (yuan / kW h) 0.4 DG unit power generation operation and maintenance cost (yuan / kW h) 0.2 Government subsidy for DG power generation (yuan / kW h) 0.2
[0167] Nodes 33-37 are newly added load nodes with a total capacity of 460kW. The specific load size is shown i...