Embodiment 1
[0024] This embodiment provides an integrated construction method for building main body and indoor and outdoor decoration, including the following steps:
[0025] Step 1: Construction of the building foundation and installation of embedded parts, the foundation extends to the standard layer; the standard layer is a well-known standard layer in existing construction projects, and it is necessary to pre-construct the embedded parts for subsequent installation during foundation construction pieces.
[0026]Step 2: Design multiple integrated modules according to the purpose of the building, and process the integrated modules in the factory according to the drawings; BIM refers to the building information model, the abbreviation of Building Information Modeling, which uses the relevant information data of the construction project as a model Based on the foundation of the building model, the real information of the building can be simulated through digital information simulation, t...
Embodiment 2
[0034] Embodiment 2 is further defined on the basis of Embodiment 1: the integrated module includes an internal water-absorbing integrated module, an external waterproof integrated module, wall connecting pieces, top connecting pieces, steel bars, steel connecting pieces, pipes, Pipe connections. When the above integrated modules are installed, the above integrated modules include the painting and decoration of the interior walls, as well as the painting and decoration of the exterior walls. When the building construction is completed, the pollutants contained in the interior decoration on the integrated module have volatilized for a period of time, and the building module can be directly inhabited after the installation and commissioning of the building module, and there is no need for ventilation again; The installation solves the problems caused by the separate construction of the traditional construction and decoration: 1. The manpower and material resources consumed by th...
Embodiment 3
[0037] Embodiment 3 is further defined on the basis of Embodiment 1: said step 5 also includes the installation of the installed internally water-absorbing and externally waterproof integrated module, soaking in water for installation, correction, fixing, and installation of other required follow-up steel bars and connections Components, various pipes and connectors, embedded parts, and check whether all functional parts are installed correctly.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com