Digital simulation pre-assembling construction method for steel structure bridges

A digital simulation and construction method technology, applied in electrical digital data processing, special data processing applications, instruments, etc., can solve the problems of long construction period, many hidden dangers, and cost money, and achieves low site requirements, high safety factor, measurement Small error effect

Pending Publication Date: 2019-01-01
湖南金海集团有限公司
View PDF4 Cites 15 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] Aiming at the deficiencies of the prior art, the present invention provides a digital simulation pre-assembly construction method for steel structure bridges, which solves the problem that the existing physical pre-assembly methods often require a large number of sites, multiple cranes and hoisting equipment, and a large number of tire frames, which consume a large amount

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Digital simulation pre-assembling construction method for steel structure bridges
  • Digital simulation pre-assembling construction method for steel structure bridges

Examples

Experimental program
Comparison scheme
Effect test

Example Embodiment

[0030] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

[0031] see Figure 1-2 , The embodiment of the present invention provides a technical solution: a construction method for digital simulation pre-assembly of a steel structure bridge, including detecting the segmental pre-assembly of the steel structure beam section and the bridge digital simulation pre-assembly, and detecting the segmental pre-assembly of the steel structure beam section. Assembly, including the following steps:

[0...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

A method for digitally simulate pre-assembling construction of steel structure bridge includes detecting segment pre-assembly of steel structure beam segment and digital-analog pre-assembly of bridge,The method comprises the following steps: step a1: establishing an overall model of a steel structure bridge according to design data; step a2: extracting a segmented model and establishing a coordinate system; step a3: determining a control point of the segmented size and a coordinate value of the control point in the model, which relates to the technical field of construction. A digital analogpre-assembling construction method for steel structure bridges so that the total station can be used for measuring by simulating pre-assembling, the control points in the solid assembly are detected during the detection of a single component, including all the control points between adjacent components. The computer is used to process the data, and the coordinate value comparison and three-dimensional model fitting of the pre-assembled components are carried out at the same time.

Description

technical field [0001] The invention relates to the technical field of construction, in particular to a digital simulation pre-assembly construction method for a steel structure bridge. Background technique [0002] Due to the limitation of transportation or hoisting conditions, large steel structure bridges are generally fabricated and installed in sections. In order to test the integrity and accuracy of bridge fabrication and ensure the smooth implementation of on-site installation, the sectioned bridge body needs to be carried out before leaving the factory. Pre-assembled in the factory. The structural form of steel structure bridges is relatively complex, and there is a spatial correlation between components, which requires high manufacturing accuracy of the interface between components. Due to the influence of cumulative errors, sometimes it is impossible to meet the requirements of on-site installation only by controlling the manufacturing accuracy of individual compon...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06F17/50
CPCG06F30/13G06F30/20
Inventor 胡岚曾勇孙宏军
Owner 湖南金海集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products