Digital simulation pre-assembling construction method for steel structure bridges
A digital simulation and construction method technology, applied in electrical digital data processing, special data processing applications, instruments, etc., can solve the problems of long construction period, many hidden dangers, and cost money, and achieves low site requirements, high safety factor, measurement Small error effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0030] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
[0031] see Figure 1-2 , The embodiment of the present invention provides a technical solution: a construction method for digital simulation pre-assembly of a steel structure bridge, including detecting the segmental pre-assembly of the steel structure beam section and the bridge digital simulation pre-assembly, and detecting the segmental pre-assembly of the steel structure beam section. Assembly, including the following steps:
[0...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap