Steel pipe outer surface preliminary maintenance device for building scaffold
A technology for maintaining equipment and external surfaces, applied in metal processing equipment, grinding/polishing equipment, grinders, etc., can solve the problems of damage to the anti-rust coating of steel pipes, high labor intensity, time-consuming and laborious, etc., to improve efficiency and reduce labor. Strength, easy spraying effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific embodiments.
[0019] see Figure 1-3 , a kind of preliminary maintenance equipment for the outer surface of steel pipes for construction scaffolding, comprising a base plate 1, an installation frame 2 is welded on the top of the base plate 1, and penetration holes 3 are opened on both sides of the installation frame 2, and the two penetration holes 3 are located at the same Horizontal line, and the inner diameter of the penetration hole 3 is 50mm, the outer diameter of the standard steel pipe on the scaffold is 48.3mm, and the inner diameter of the penetration hole 3 is 50mm, the steel pipe can be inserted into the inside of the installation frame 2, and the inner wall of the installation frame 2 The bottom on the left side is fixedly installed with the first d...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


