Dynamic Load Adjustment Method of Hydropower Station Based on Unilateral Matching Mechanism

A matching mechanism and load adjustment technology, applied in AC network voltage adjustment, power network operating system integration, instruments, etc., can solve the incompatibility of lower-level hydropower stations, the incompatibility of hydropower station's own load, inflow flow, and reservoir regulation capacity. The richness of effects needs to be improved, etc.

Active Publication Date: 2021-12-24
CHANGJIANG SURVEY PLANNING DESIGN & RES
View PDF10 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In fact, most of the unfavorable working conditions occur in lower-level hydropower stations with weak regulation capacity. The essence of the problem reflects the incompatibility of the lower-level hydropower stations in two aspects: one is the interaction between the hydropower station's own load, inflow flow and reservoir regulation capacity. The second is the mutual incompatibility of the upstream and downstream cascade load process
The overall processing method in the existing technology is difficult to comprehensively reflect the nature of the problem, and the richness of technical effects needs to be improved

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Dynamic Load Adjustment Method of Hydropower Station Based on Unilateral Matching Mechanism
  • Dynamic Load Adjustment Method of Hydropower Station Based on Unilateral Matching Mechanism
  • Dynamic Load Adjustment Method of Hydropower Station Based on Unilateral Matching Mechanism

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment approach

[0110] Two unfavorable typical working conditions in daily operation are respectively selected for method application. The specific implementation is as follows:

[0111] (1) Unfavorable working condition 1: the risk of emptying the storage capacity

[0112] Perform steps 1 to 9 in sequence until the load adjustment scheme of hydropower station B that meets the safety requirements of reservoir dispatching is obtained. Table 1 shows the evaluation index values ​​of the power generation load scheme before and after adjustment. Figure 3 ~ Figure 6 for the corresponding scheduling process.

[0113] Table 1 Unfavorable working condition one load scheme index results before and after adjustment

[0114]

[0115] Calculated:

[0116] ①Analysis of power grid operation status: Hydropower station B has carried out load adjustment in 24 periods from 11:00 to 16:45, accounting for 25% of the total hours of the day. After the adjustment, the daily power generation of hydropower st...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a method for dynamic load adjustment of a hydropower station based on a unilateral matching mechanism, comprising the following steps: obtaining an initial scheduling process; determining the load adjustment time t*, calculating the load matching coefficient R of the upper and lower hydropower stations on the current day; formulating a unilateral matching mechanism based on It carries out full-cycle dispatch calculation, and implements early warning judgment of operating water level and river flood control; outputs load adjustment plans that meet the early warning requirements, and analyzes the matching of load processes before and after the adjustment of cascade hydropower stations; the evaluation results are used in both reservoir dispatching and power grid operation. aspects of security. The purpose of the present invention is to provide a dynamic load adjustment method of hydropower station based on the unilateral matching mechanism to improve the matching of the upstream and downstream cascade load processes, and to promote the adjustment ability of the hydropower station to the uncertainty of the incoming water and the load process. to ensure the safe operation of hydropower stations.

Description

technical field [0001] The invention belongs to the technical field of water conservancy project management and hydropower energy dispatching, and in particular relates to a dynamic load adjustment method of a hydropower station based on a unilateral matching mechanism. Background technique [0002] The process from hydropower output to grid connection requires the coordination and cooperation of the grid dispatching department and the reservoir dispatching department. For cascade hydropower stations with a series structure, when the upper and lower hydropower stations belong to different power grid dispatching departments, the difference in the load characteristics of the regional power grid will cause a mismatch in the output process of the two hydropower stations. [0003] The unmatched load process has brought great pressure to the dispatching and operation of downstream hydropower stations, especially when the adjustment storage capacity of the lower-level hydropower st...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): H02J3/14G06Q10/06G06Q50/06
CPCH02J3/14G06Q10/06312G06Q50/06Y02A10/40Y04S10/50Y04S20/222Y02B70/3225
Inventor 仲志余李荣波丁毅李安强
Owner CHANGJIANG SURVEY PLANNING DESIGN & RES