Precast slab, and method for connecting precast slab with precast slab and beam
A connection method and technology of prefabricated panels, applied in the processing of building materials, building materials, construction, etc., can solve the problems of floor concrete, poor construction accuracy, and vulnerable prefabricated panels, such as "mustache tendons", and achieve reliable connection and quick installation. The effect of shortening the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] like figure 1 and figure 2 As shown, this embodiment provides a prefabricated panel, which includes a prefabricated panel body 10, a grooved connector 20 and an anchor bar 30, and the grooved connector 20 includes an upper ear plate 202, a vertical plate 200 and a lower Ear plate 204, the upper ear plate 202 and the lower ear plate 204 are respectively located on the upper and lower ends of the vertical plate 200, the upper ear plate 202, the vertical plate 200, and the lower ear plate 204 can be made by cutting steel plates, and the vertical plate The upper and lower edges of 200 are connected with the upper ear plate 202 and the lower ear plate 204 respectively by fillet welding; mass production can also be made by mold casting or customized channel steel. Both the upper ear plate 202 and the lower ear plate 204 are provided with pin holes 206 in the middle, and the vertical plate 200 is provided with anchor rib holes 208 .
[0035] refer to image 3 , the upper e...
Embodiment 2
[0041] refer to Figure 4 and Figure 5 , this embodiment provides a connection method using the prefabricated slab provided in embodiment 1 to the prefabricated slab and the beam, the connection method includes the following steps:
[0042] S1. Provide the beam 4, the first prefabricated slab 1a and the second prefabricated slab 1b, the supporting end surface of the first prefabricated slab 1a and the beam 4 is pre-embedded with a first groove-shaped connector 20a, and the first groove-shaped The connecting piece 20a is provided with a first pin hole 206a, and the supporting end surface supported by the second prefabricated plate 1b and the beam 4 is pre-embedded with a second grooved connecting piece 20b, and the second grooved connecting piece 20b is provided with The second pin hole 206b; the manufacturing process of the first grooved connector 20a and the second grooved connector 20b embedded in the first prefabricated panel 1a and the second prefabricated panel 1b is th...