Embodiment 1
[0029] The spreader of the plastering bucket used for building walls of the present invention includes a vertical pole and a double-layer cross.
[0030] see now figure 1 , figure 1 It is a structural schematic diagram of the spreader of the plastering bucket according to the embodiment of the present invention. As shown in the figure, the vertical rod is a steel pipe 2 with a diameter of 20 mm and a length of 957 mm, and a hook 1 is provided on the top of the steel pipe, and the hook is a ring with a diameter of 50 mm.
[0031] Described double-layer cross 3 is two structures, the same steel bar cross bracket of size, and the four strut lengths of steel bar cross bracket are equal, and the upper floor cross of double-layer cross and the lower floor cross are arranged in parallel with each other, at an interval of 400mm; A rod end is provided with a hook seat 4, so that the hook hangs the plastering bucket and lifts the rope; the cross is formed by welding four poles with a ...
Embodiment 2
[0034] The manufacturing method of the plaster bucket for wall-building of the present invention comprises the following steps:
[0035] a. Production of vertical rod and hook: Take a steel pipe 2 with a diameter of 20mm and a length of 957mm as a vertical rod, weld and fix a ring with a diameter of 50mm as the hook 1 at the upper end of the steel pipe, and make the ring with a diameter of 20mm round steel;
[0036] b. Fabrication of steel bar cross support: take two steel bars with a diameter of 12 mm and a length of 800 mm, and make them be welded and fixed with their midpoints perpendicular to each other to form the lower cross; the center of the lower cross is welded and fixed to the lower end of the steel pipe 2, and the steel pipe is perpendicular to the plane of the cross; Use the same method to make the upper cross, the center of the upper cross is welded to the middle of the steel pipe 2, so that the distance between the upper cross and the lower cross is 400mm;
[00...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Diameter | aaaaa | aaaaa |
| Length | aaaaa | aaaaa |