Construction method using self-suspending clear water fracturing proppant
A technology of water fracturing and construction method, applied in chemical instruments and methods, mining fluids, earthwork drilling, etc., can solve the problems of inconvenient construction, long cycle, high cost, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] The construction method using self-suspending clean water fracturing proppant includes the following steps:
[0050] (1) Use a high-pressure pump truck to pump natural water into the underground reservoir for fracturing at a displacement of 2 cubic meters per minute to form initial fractures;
[0051] (2) Continuously add clean water into the sand mixer as the sand-carrying fluid, and at the same time, add self-suspension clean water fracturing proppant at a displacement of 2.2 cubic meters per minute and stir to make sand-carrying fracturing fluid. The sand mixing time is 10 seconds; self-suspension The sand-water volume ratio of clear water fracturing proppant to sand-carrying fluid is 40%, and the relationship between sand mixing speed Y and sand-water volume ratio X is controlled at Y=118.35X 0.1918 ;
[0052] (3) After the initial fractures are formed, a high-pressure pump truck is used to continuously pump sand-carrying fracturing fluid into the initial fractures...
Embodiment 2
[0062] The construction method using self-suspending clean water fracturing proppant includes the following steps:
[0063] (1) Use a high-pressure pump truck to pump natural water into the underground reservoir for fracturing at a displacement of 2.5 cubic meters per minute to form initial fractures;
[0064] (2) Continuously add clean water into the sand mixer as the sand-carrying fluid, and at the same time add self-suspension clean water fracturing proppant at a displacement of 2.6 cubic meters per minute and stir to make sand-carrying fracturing fluid. The sand mixing time is 12 seconds; self-suspension The sand-water volume ratio of clear water fracturing proppant to sand-carrying fluid is 45%, and the relationship between sand mixing speed Y and sand-water volume ratio X is controlled at Y=118.35X 0.1918 ;
[0065] (3) After the initial fractures are formed, a high-pressure pump truck is used to continuously pump sand-carrying fracturing fluid into the initial fracture...
Embodiment 3
[0075] The construction method using self-suspending clean water fracturing proppant includes the following steps:
[0076] (1) Use a high-pressure pump truck to pump natural water into the underground reservoir for fracturing at a displacement of 1.5 cubic meters per minute to form initial fractures;
[0077] (2) Continuously add river water into the sand mixer as the sand-carrying fluid, and at the same time add self-suspension clear water fracturing proppant at a displacement of 3 cubic meters per minute and stir to make sand-carrying fracturing fluid. The sand mixing time is 15 seconds; self-suspension The sand-water volume ratio of clear water fracturing proppant to sand-carrying fluid is 50%, and the relationship between sand mixing speed Y and sand-water volume ratio X is controlled at Y=118.35X 0.1918 ;
[0078] (3) After the initial fractures are formed, a high-pressure pump truck is used to continuously pump sand-carrying fracturing fluid into the initial fractures ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


