A DC test method and system based on UTC
A test method and technology of a test system, which are applied to the redundancy in the operation for data error detection, error detection/correction, and response error generation, etc., can solve problems such as waste of resources, increase interference items, etc. The effect of avoiding waste of resources and wide application prospects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0056] Such as figure 1 As shown, the present invention provides a UTC-based DC test method. The DC test is performed by a single test machine server, the number of DC test cycles is set, the time conversion is set, the timestamp under Linux is converted to UTC, and the switch is calculated according to UTC. The delay time is long, and the power on and off information is recorded; the specific steps are as follows:
[0057] S1. The test machine server obtains the boot time; the specific steps are as follows:
[0058] S1-1. Record the current time after the test machine server is turned on;
[0059] S1-2. The test machine server acquires the boot time; the test machine server acquires the boot time by reading the boot log;
[0060] S1-3. The test machine server calculates the boot time according to the current time recorded after booting and the booting time;
[0061] S2. Judging whether the testing machine server has reached the set number of cycles;
[0062] S3. If not, a...
Embodiment 2
[0105] Such as figure 2 As shown, the present invention provides a UTC-based DC test system, including:
[0106] The boot time acquisition module 1 is used for the test machine server to acquire the boot time; the boot time acquisition module 1 includes:
[0107] The time recording unit 1.1 after booting is used to record the current time after the server of the testing machine is powered on;
[0108] The boot time acquisition unit 1.2 is used for the test machine server to obtain the boot time; the test machine server obtains the boot time by reading the boot log;
[0109] The power-on time calculation unit 1.3 is used for the test machine server to calculate the power-on time according to the current time recorded after power-on and the power-on time;
[0110] Cyclic test judging module 2, used to judge whether the testing machine server reaches the set number of cycles;
[0111] The number of cycles increase module 3 is used to add 1 to the current number of cycles when...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com