Method for ecologically breeding lobsters in ponds or paddy fields in high-density manner
A high-density, paddy field technology, applied in the field of freshwater aquaculture, to achieve the effect of improving the buffer capacity of water bodies, increasing production, and promoting growth and development
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] Pond culture model
[0033] 1. Pond site selection: The selected pond requires abundant water sources throughout the year, no pollution, and no wastewater discharge upstream. If there is no suitable water source, you can choose groundwater; try to choose clay as the crayfish pond instead of sand and cement slope protection ponds. Crayfish on sandy soils tend to collapse when they make holes, while cement slope crayfish cannot make holes;
[0034] 2. Construction of shrimp ponds: the area of a single pond should be controlled at about 20-25 acres. The pond should be in the north-south direction, length: width=2:1, trench 8 is dug around shrimp pond 9, and the width of trench 8 is wide. 5-8 meters, the bottom of the ditch is 2-3 meters wide, the depth of the ditch is 1.2-1.5 meters, and the slope is 1:3. There is a 1-2 meter wide ridge at the top of the trench 8. The pond ridge is 1.5 meters above the field surface. It is convenient for future operations and can prevent the...
Embodiment 2
[0054] Rice farming mode
[0055] 1. Site selection and construction of paddy fields: the selected paddy fields are required to cultivate non-sandy paddy fields all year round, without pollution and no wastewater discharge upstream; the appropriate paddy field area should be controlled at about 20-25 acres, and trenches 8 should be dug around the paddy field 9. The width of the trench 8 is 5-8 meters, the bottom of the trench is 2-3 meters, the depth of the trench is 1.2-1.5 meters, the slope is 1:3, and the top of the trench 8 is left with a ridge of 1-2 meters wide. The field ridge is required to be 1.5 meters above the field surface, which is convenient for future operation and can prevent the collapse of the bank. Outside the ridge, a circulating water ditch 11 with a depth of 1 meter is dug. At the junction of the surrounding ditch 8 and the rice field 9, an inner dam 10 with a height of 20-30 cm needs to be built to separate the surrounding ditch 9 from the shrimp pond 9. ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com