Construction technology of underground continuous wall
A technology of underground diaphragm wall and construction technology, applied in sheet pile wall, foundation structure engineering, construction, etc., can solve problems affecting construction quality and efficiency of construction, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] The technical solutions of the present invention will be further described below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0033] Such as figure 1 Shown, the plan view of the diaphragm wall to be constructed, a kind of underground diaphragm wall construction technology, process flow chart, comprises the following steps:
[0034] S1: measurement stakeout;
[0035] Measure and release the control piles of the axis of the underground wall according to the external release requirements. The control piles must be equipped with protective piles, and the elevations are introduced into the site. The closed backtest method is used to set the benchmark points in the site, so as to control the elevation of the guide wall and the underground diaphragm wall;
[0036] S2: guide wall construction;
[0037] Before the underground diaphragm wall is grooved, the guide wall shall be poured. The guide wall is carefully constructed, and ...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com