Design method of anti-seepage body for high concrete face rockfill dam with deep overburden in narrow channel
A technology of face rockfill dam and deep covering layer, applied in the direction of barrage, dam, weir, etc., can solve the problems of irregular toe plate X-ray, complicated structure design of anti-seepage panel, broken panel and other problems, to ensure stability safety and security, facilitate routine maintenance and informatized real-time monitoring, and improve the effect of stress and deformation states
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The present invention will be described in detail below in conjunction with the implementations shown in the drawings, but it should be noted that these implementations are not limitations of the present invention, and those of ordinary skill in the art based on the functions, methods, or structural changes made by these implementations Equivalent transformations or substitutions all fall within the protection scope of the present invention.
[0020] This embodiment provides a method for designing an anti-seepage body of a high concrete face rockfill dam on a deep overburden layer in a narrow river channel, including the following steps:
[0021] 1) Partially excavate the deep and thick overburden in the narrow channel, and arrange a gravity arch dam at the position of the narrow channel, and use the bedrock at both ends of the channel to share the load on the arch dam.
[0022] 2) On the top platform of the gravity arch dam, lay a toe-slab with the same width as the pl...