One-time pouring moulding method for pipe rack segment
A forming method and corridor segment technology, applied in construction, water conservancy projects, artificial islands, etc., can solve the problems of high overall cost, long construction period, and easy water seepage at construction joints, and achieve low overall cost, short construction period, Increased overall stability effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0024] The one-time pouring and forming method of the pipe gallery segment, including (1) positioning and setting out; (2) binding of bottom plate and side wall reinforcement; (3) side wall formwork installation; (4) load-bearing bracket installation; (5) roof formwork installation; (6) The installation of roof reinforcement also includes the following steps:
[0025] (7) Concrete pouring: Concrete is poured in layers. When the first layer of concrete is poured in the pipe gallery, the initial concrete slump is 180mm-200mm. At this time, strengthen the vibration to ensure that the concrete is poured to fill the entire floor, and then the concrete slumps The depth is 17010mm, and it is poured to 20cm above the inner bottom of the pipe gallery, and the upper layer of concrete is poured after waiting for 45 minutes; when the first layer of concrete is poured, it is first poured from the middle partition wall, then the right outer wall, and finally the left outer wall; after that, ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com