A multi-mode closed tbm suitable for the Dashanling Tunnel and its construction method
A construction method and closed-mode technology, which is applied in the field of multi-mode closed TBM and its construction, can solve problems such as poor adaptability and single function of shield tunneling/TBM
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 2
[0035] Embodiment 2, a multi-mode closed TBM suitable for long mountain tunnels, the muck transportation system includes an equipment belt conveyor 11 and a continuous belt conveyor 13, the front end of the equipment belt conveyor 11 is connected to the central screw conveyor 9 or the bottom The reserved screw machine 6 is corresponding, that is, the center screw machine and the bottom reserved screw machine can be switched for use. When the center screw machine is used, the front end of the equipment belt conveyor 11 corresponds to the center screw machine, and is used to receive the slag in the center screw machine. Soil, when using the reserved screw machine at the bottom, the front end of the equipment belt conveyor 11 corresponds to the reserved screw machine at the bottom, and is used to receive the muck in the reserved screw machine at the bottom. The rear end of the equipment belt conveyor 11 is corresponding to the continuous belt conveyor 13, and is used to transport ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com