A pre-embedded positioning bracket for steel column anchor bolts and construction method
A technology of anchor bolts and positioning brackets, which is applied to the field of positioning brackets embedded in steel column anchor bolts, and can solve problems such as inconvenient adjustment, deviation of the plane position and level of the anchor bolts, and high cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0051] Such as Figure 1 to Figure 7 , Figure 9 to Figure 10 As shown, a positioning bracket for pre-embedded steel column anchor bolts provided in this embodiment includes an external bracket 1, a positioning steel plate 2, and a positioning support frame 3. The external bracket 1 includes a left half bracket 11 and a right half bracket set separately. The bracket 12, the left half bracket 11 and the right half bracket 12 can be detachably arranged on the foundation cushion 4 and are located on both sides of the outer sides of the platform reinforcement 5, and the platform reinforcement 5 is the steel column foundation for fixing the steel column. For the cap steel bars before pouring, the cap cap steel bars 5 are arranged on the foundation cushion 4, the positioning steel plate 2 is located above the cap cap steel bars 5 and erected between the left half bracket 11 and the right half bracket 12, and the left half bracket 11 and the right half bracket The right half bracket...
Embodiment 2
[0058] Such as Figure 8 As shown, the difference between this embodiment and Embodiment 1 is that the cross bar 32 at the position corresponding to the positioning hole 20 is surrounded by a side bar 34 to form a fixed through hole 35 matching with the anchor bolt 6, and the side bar 34 Comprising a long cross bar 341 welded on one side of a cross bar 32, a short longitudinal bar 342 welded between the cross bar 32 and the long cross bar 341, the short longitudinal bar forms a strip between the cross bar 32 and the long cross bar The shape space is divided into a plurality of fixed through holes 35, the cross bar 32 and the long cross bar 341 are parallel to each other, and the bottom of the anchor bolt 6 runs through the fixed through hole 35, so that the fast limit and fixation of the bottom of the anchor bolt 6 can be realized, and it is more convenient. It is stable and effectively prevents the anchor bolts 6 from shifting due to concrete impact and vibration. The two en...
Embodiment 3
[0060] Such as Figure 1 to Figure 12 As shown, this embodiment provides a construction method for pre-embedding steel column anchor bolts. According to this construction method, the required labor organization and personnel responsibilities are as follows:
[0061] serial number type of work number of people responsibility 1 construction manager 1 Technical guidance, release, on-site management 2 general worker 2 Responsible for tools, material delivery, and coordination operations
[0062] The main materials required are as follows:
[0063]
[0064] The main machinery and equipment required are as follows:
[0065] Machine name model quantity precision total station RTS112SR6 1 set ±2", the maximum allowable error is ±20" Automatic Leveling Level DS-32 1 set Km back and forth ± 1mm walkie talkie - 3 units - tape measure 5m 2 - pistol drill FOGO1001 1 -
[0066] A...