Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for determining required wheel gear withdrawing time of flight

A block and time technology, which is applied in the field of determining the required block time of a flight, can solve the problems of long waiting time for passengers and low implementability of the flight ground support plan.

Pending Publication Date: 2019-07-09
上海治仁信息科技有限公司
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] In order to solve the low implementability of the flight ground support plan caused by the frequent jumps of DOBT issued to the airline, and the problem that the waiting time of passengers on the plane may be too long, the present invention proposes a method to determine the flight time. A method for requesting off-block time, the method includes the following steps:

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for determining required wheel gear withdrawing time of flight
  • Method for determining required wheel gear withdrawing time of flight

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0014] Below, combined with figure 1 The method of the present invention for determining the required off-block time DOBT of a flight is described in detail.

[0015] Such as figure 1 As shown, the present invention determines the method for the request OBT of flight comprising the following steps:

[0016] First of all, after the airport collaborative decision-making system or air traffic flow management related system and other management systems issue the calculated off-block time COBT, according to the calculated off-block time COBT, the airlines issue the required off-block time DOBT and update the required off-block time Time DOBT sets the update threshold N1. Among them, air traffic flow management related systems mainly include air traffic flow management system and collaborative air traffic management (CDM) decision-making system. Preferably, the value range of the update threshold N1 is 5-90 minutes, such as 30 minutes or 60 minutes. During specific implementation...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the field of civil aviation air traffic flow management and airport operation management, in particular to a method for determining flight demanded wheel gear withdrawing time. The method is used for solving the problem that the feasibility of a flight ground guarantee plan is low due to the fact that an airline requires DOBT frequency hopping. In order to solve the problem that the waiting time of passengers on aircrafts is too long, the invention provides a method for determining the required departure gear time of flights, which comprises the following steps that: amanagement system publishes DOBT and an update threshold N1 to airlines according to the published COBT; when COBT is more than TOBT, confirming that COBT is valid, turning to the next step, when COBT is more than TOBT, confirming that COBT is invalid, and returning to the previous step; when COBT (DOBT or COBT) DOBT + N1, DOBT is updated to obtain DOBTnew, and DOBTnew = COBT; and when the DOBT is greater than or equal to COBT and less than or equal to DOBT + N1, the DOBT is not updated. When the method is used for determining the DOBT of the flight, the jumping frequency of the DOBT can be effectively reduced, the implementability of a flight ground guarantee plan is improved, the waiting time of passengers on an airplane is shortened, and the taking experience of the passengers is effectively improved.

Description

technical field [0001] The invention relates to the field of operation management of civil aviation airports, in particular to a method for determining the required off-block time of flights. Background technique [0002] At present, in the operation of the civil aviation airport collaborative decision-making system (A-CDM), as well as in the management of air traffic flow and airline support target management, it is necessary to calculate the COBT of the flight, and calculate the COBT based on this Determine the required off-block time DOBT of the flight, so that the airline can complete the ground support work before the required off-block time DOBT, so that the flight can implement the off-block operation at the required off-block time DOBT. [0003] Civil Aviation Airport Collaborative Decision-Making System (A-CDM) and related systems of air traffic flow management usually need to adjust flight departure sequence to increase runway capacity, and according to complex run...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q50/30G06Q10/06
CPCG06Q10/06312G06Q50/40
Inventor 李丹阳乔启虎谭程程
Owner 上海治仁信息科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products