Intelligent control method for bridge section prefabricated field
A control method and technology of prefabrication field, applied in the directions of manufacturing tools, image data processing, resources, etc., can solve the problems of untimely progress reporting, delayed construction period, low degree of informatization, etc., to reduce workload, improve construction quality, The effect of improving production efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] The present invention will be further described in detail below in conjunction with examples, but the embodiments of the present invention are not limited thereto.
[0025] The intelligent control method of the bridge segment prefabrication field in this embodiment first needs to establish a prefabrication field for producing prefabricated segmental beams in the BIM data management platform, the plane design drawings of the prefabrication field, the The layout of the production area, the production equipment of the prefabrication field, the information of the project personnel and the information of the prefabrication production components are input, and the above data are integrated and analyzed in the BIM data management platform, and the BIM model of the bridge section prefabrication field is established.
[0026] According to the actual erection needs of the bridge, enter the order information of the prefabricated segmental beams on the BIM management platform. The o...