Power system partition optimization algorithm considering recovery time
A technology for power system and zoning optimization, applied in the power grid field, can solve problems such as low black start efficiency and inconsistent size of subsystems, and achieve the effect of improving recovery efficiency and shortening the gap.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0113] The black starter system division method of the present invention is used to divide the IEEE-39 standard test system to verify the validity of the algorithm. The IEEE-39 standard test system includes 12 transformers, 34 lines and 10 generator sets, 30 to 39 nodes are equipped with generator sets, and the remaining 29 are bus nodes.
[0114] Assuming that the power grid is completely shut down at the initial stage of the black start, the generators 30, 32, and 37 are used as black start power sources with self-starting capabilities after a major blackout in the power system, and their installed capacities are 250MW, 650MW, and 540MW respectively. The starting characteristics of each unit are shown in Table 1 It shows that the start-up time of the transmission line and the transformer branch is 5 minutes.
[0115] Table 1 Power Startup Characteristics
[0116]
[0117] First determine the initial large grid partition scheme, such as image 3 As shown in Table 2, as w...