Movable compensating drill unit
A compensation type, drill bit technology, applied in the direction of drill bit, drill pipe, drill pipe, etc., can solve the problems of reducing the time for tripping and tripping the pipe string, taking a lot of time, wasting manpower, material and financial resources, etc., so as to reduce drilling costs and operations. Cost and effect of reducing working time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Embodiment 1, with reference to attached Figure 1-7 , a kind of movable compensating drill bit device mentioned in the present invention, taking as an example a group of main drill bit devices and a group of spare drill bit devices, its technical solution is: including drill rod advancing body 1, drilling tool carrier 2, center Consumable body 3, main drilling and milling bit 4, spare bit expansion mechanism 6, spare bit rotating shaft 7, spare bit support rod 8, force transmission torque bar 9, circulating fluid channel 10, spare drilling and milling bit 11, drill bit anti-twist sipe 12. Spare drill bit deployment groove 14, the first drill bit deployment groove 15, the first drill bit deployment shaft 16, the first support rod 17, the first drill bit deployment spring 18, the first drill bit rotating shaft 19, in the drill pipe advancing body 1 The rear end is provided with an external thread 13 for connecting the drill pipe, the drill pipe advancing body 1 is provid...
Embodiment 2
[0049] Embodiment 2, the difference between the present invention and embodiment 1 is:
[0050] The standby drill device is provided with two groups, which are assembled on the center consumption body 3 successively. In this way, after the main drill device and the first standby drill device have been scrapped due to drilling and milling failure, the second standby drill device can be used again. The structure is the same as that of the first spare drill device. The drill bit device is the same, only the length of the central consumption body 3 needs to be lengthened.
[0051] Compared with Embodiment 1, its advantage is that it reduces the time for lifting the drill pipe and lowering the drill pipe once more. If it is in a deep well above 5000 meters, it can save a week or even two weeks, which is necessary for deep well drilling. In other words, it greatly saves drilling time and improves drilling efficiency.