An elevator safety detection method based on the bending times of elevator wire rope
A technology of bending times and wire ropes, applied in elevators, transportation and packaging, etc., can solve the problems of broken wires, decreased toughness, and the inability to obtain the bending times of wire ropes.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0118] Step 1. In each operation of the elevator, obtain the number of forward bending and the number of reverse bending at each position of the elevator based on the destination floor number information received by the elevator control panel and the basic information of the elevator.
[0119] See attached figure 2 As shown, in this embodiment, based on the basic information of the elevator, the length L1 of the wire rope wound on the traction sheave during elevator operation is obtained according to formula (a); where L1 is the first geometric tangent point 1 of the wire rope and the traction sheave. The length of the wire rope from the position to the second geometric tangent point 2 of the wire rope and the traction wheel;
[0120] Formula (a):
[0121]
[0122] Where α: represents the wrap angle between the wire rope and the traction sheave;
[0123] D1: Indicates the diameter of the traction wheel.
[0124] Obtain the wire rope length L2 between the traction sheave and the guide ...
Embodiment 2
[0179] This embodiment refers to the elevator parameters of a certain commercial building as shown in Table 1.
[0180] Table 1 The main parameters of the example elevator
[0181]
[0182] Q1: In this embodiment, the diameter of the traction wheel and the guide wheel are 400 millimeters and 380 millimeters (mm), respectively, and the wrap angle is α=150°, β=120°. The wheel center distance between the two wheels is 2 meters. Get the following length parameters:
[0183]
[0184]
[0185]
[0186] In this embodiment, it is assumed that the current elevator is in the i-th ascending process since the elevator was installed and put into use. Assuming that the initial number of floors of the elevator is 7, then a i Is 7. Assuming that the destination floor number of the elevator is 15, then b i For 15. It can be calculated that the length of the moving wire rope during the elevator ascent is ΔHi=3×|15-7|=24m, the initial number of layers corresponds to the wire rope coordinate position...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com