Double-span simply-supported inverted arch trestle rapid construction method
It is a rapid and construction-based technology, which is applied in the shaft lining, tunnel lining, underground chamber, etc., and can solve problems such as progress less than 2m, safety steps exceeding the standard, and increasing the distance between the tunnel face and the lining, so as to save construction time, Effects of construction safety and time saving for the initial erection of an inverted arch
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] A rapid construction method for a double-span simply supported inverted arch trestle bridge, such as Figure 1-3 As shown, it mainly includes the following steps:
[0030] 1. Construction of the first set of inverted arch primary support trestle area
[0031] 1) Specifications of inverted arch initial support trestle bridge. According to the specific gravity of the tunnel's overall surrounding rock, the length of the initial support inverted arch trestle is selected. If the tunnel is dominated by surrounding rocks of grade II-III, the operating space for the initial branch of the inverted arch trestle can be selected as 12m. If the tunnel is dominated by surrounding rocks of grade IV-V, the operating space for the primary branch of the inverted trestle bridge is selected to be 6-10m.
[0032] 2) Excavation at the initial support section of the inverted arch. Each excavation of surrounding rocks of grades IV-V shall not exceed the length of the distance between three...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 