A construction method of steel integrated internal support for pipe gallery
A construction method and pipe gallery technology, applied in artificial islands, water conservancy projects, infrastructure projects, etc., can solve problems such as slow construction speed, achieve the effects of simple construction, shorten construction period, and avoid slurry leakage and expansion.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] In order to further describe the construction method of a special steel integrated internal support for pipe gallery of the present invention, it will be further explained below in conjunction with the accompanying drawings.
[0021] Figure 1-2 Middle: A construction method of steel integrated internal support for pipe gallery, including the following steps:
[0022] Step 1. Construction preparation, prefabrication and processing of steel integrated inner support 1;
[0023] Step 2. Prefabricate and process the steel integrated inner support 1, which can adjust the horizontal distance, and use the horizontal support wire 2 to adjust the horizontal distance of the inner support. At this stage, the adjusted horizontal distance must be smaller than the net width of the pipe gallery;
[0024] Step 3. Hoist the inner support 1 equipped with horizontal support wire 2 to the designated position of the pipe gallery and not completely put it down, so that the inner support 1 i...