Comprehensive evaluation system for evaluating power supply service level
A technology of comprehensive evaluation and service level, applied in the field of electric power service, can solve the problems of evaluation machinery curing, lack of comprehensive evaluation of services, lack of dynamic adjustment of the system, etc., to achieve the effect of improving accuracy and solving evaluation deviations
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach 1
[0043] Implementation Mode 1: Provide basis for company decision-making through this system
[0044] In the first quarter of 2018, Company A ranked among the top ten companies in all counties in terms of "business standard rate" and "payment error rate". However, through the comprehensive evaluation system of power supply service level, it is found that some of the company's business hall staff have been monitored and reported many times for playing mobile phones or doing things unrelated to work during working hours, which is somewhat contradictory to the evaluation results of the "business standard rate of business halls". Further analysis found that due to the small daily business volume and number of charges in some business halls of the company, the indicators of "business standard rate of business halls" and "payment error rate" were relatively good, but at the same time, the staff had a lot of free time and their working conditions were sloppy , The utilization rate of ...
Embodiment approach 2
[0045] Implementation Mode 2: This system can dynamically and comprehensively evaluate the power supply service level of each unit
[0046] In the first quarter of 2018, the compliance rate of company B's service time limit for business expansion application and installation was 100%, but the satisfaction rate of the business expansion return visit was low, and there were many complaints about the business expansion application and installation exceeding the time limit. However, with post-event centralized entry, the flow of work orders for business expansion within the system is less than 3 hours.
[0047] The traditional indicators only evaluate the overtime in the process of business expansion, reporting and loading, and do not consider the problem of extracorporeal circulation that is extremely short in the process of business expansion. To this end, we have added a new fourth-level evaluation factor "the number of abnormal work orders with an ultra-short time limit for th...
Embodiment approach 3
[0048] Implementation Mode 3: Process management and control of early warning of service factors for daily changes
[0049] Use static alarm and dynamic early warning functions to predict the wind direction of power supply services, so that managers can prevent the occurrence of adverse impact events, or pre-control service risks in advance, and minimize adverse impacts. Strengthen the management and control analysis of factors that affect service evaluation, strengthen timely handling of problems, and improve service management and control capabilities.
[0050] On October 1, 2018, the audio and video monitoring module of the business hall in the system evaluation model found that a certain business hall of Company C was not open during business hours, and automatically triggered the SMS platform to send the early warning unit and evaluation results to the local service management and control personnel, requesting Company C to reply Verification results.
[0051] After recei...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com