Post-disaster repair decision-making method and device for a power distribution network

A decision-making method and distribution network technology, applied in genetic rules, instruments, data processing applications, etc., can solve the problem of not achieving the minimum economic loss, not considering the coordinated action of construction teams and material vehicles, and separately considering vehicle paths or switching sequences, etc. question

Active Publication Date: 2020-02-28
NARI TECH CO LTD +3
View PDF7 Cites 19 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to solve the problem that the traditional method of post-disaster emergency repair of the current distribution network is to consider the vehicle path or switch sequence alone, without considering the coordinated action of the construction team and the material vehicle, and often cannot achieve the goal of minimum economic loss. Method and device for emergency repair decision-making after network disaster

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Post-disaster repair decision-making method and device for a power distribution network
  • Post-disaster repair decision-making method and device for a power distribution network
  • Post-disaster repair decision-making method and device for a power distribution network

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0293] The present invention uses the PG&E 69 node system to verify the effectiveness of the method. Its topology is as image 3 shown. The red X indicates the fault line, respectively F1(30-31), F2(33-34), F3(65-66), F4(88-89), F5(15-16), F6(20-21) . ), Y3(14-90), Y4(26-54), Y5(38-48), there are two warehouses, namely D1 and D2 (not shown in the figure), and nodes 1-90 are load points.

[0294] There are four construction teams, A, B, C, and D, and six material transport vehicles, V1, V2, V3, V4, V5, and V6, with the same carrying capacity of 50 vehicles.

[0295] Assuming that faults occur at the same time, the isolating switch at the fault point is immediately disconnected to isolate the fault.

[0296] The repair time required for each fault point is shown in Table 1:

[0297] Table 1 Node maintenance time

[0298]

[0299] The detailed solution process is as follows:

[0300] (1) When the fault starts, the main program of the simulated annealing algorithm generate...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a post-disaster repair decision-making method and device for power distribution network. The method comprises the steps of collecting fault information distribution transformerlevel disaster damage information,first-aid repair teams and material transport vehicle information under disaster conditions; on the premise of meeting the distribution network operation constraintand the path planning constraint,using distribution network fault point selection and first-aid repair teams and material scheduling as decision variables,establishing a power distribution network frame reconstruction and material personnel allocation auxiliary decision-making model,wherein the model comprises a lower tie line action scheme determination model taking the maximum recovery load as atarget and an upper construction team and material scheduling scheme determination model taking the minimum total power loss in the rush-repair process as a target; and solving the dispatching auxiliary decision-making model by adopting an upper-lower layer iterative solving method,and finally determining a post-disaster repair decision-making scheme of the power distribution network. According to the method,the problem that the target of minimum economic loss cannot be achieved due to the cooperative action of a construction team and a material vehicle is fully considered,and decomposition codes of all parts are simplified.

Description

technical field [0001] The invention belongs to the field of emergency repair scheduling of electric power systems, and relates to a decision-making method and device for emergency repair of distribution networks after disasters. Background technique [0002] Due to the low design standard of the distribution network, a large number of physical failures of the distribution network will be caused during the occurrence of natural disasters (such as blizzards, typhoons, etc.). In the extreme ice and snow disaster in 2008, the power grids of 16 provinces (autonomous regions and municipalities directly under the central government) suffered serious damage, such as ice-covered lines, collapse of iron towers, tripping of substations, large-scale power outages, etc., and the direct and indirect economic losses caused by broken cables alone Just nearly one billion yuan. After a disaster occurs, the construction team needs to arrange the emergency repair order of the construction tea...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06G06N3/12
CPCG06Q10/06311G06Q10/06313G06Q10/0637G06Q50/06G06N3/126Y04S10/50
Inventor 郁琛倪明李尚轩谢云云常康吴涵刘冰倩
Owner NARI TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products