Construction method of cable bent tower stay cable installation system

A construction method and technology of cable-stayed cables, which are applied to cable-stayed bridges, erection/assembly bridges, bridge materials, etc., can solve problems such as high cost and poor stability, and achieve improved construction efficiency, enhanced stability, and increased super-static indeterminacy The effect of times

Inactive Publication Date: 2020-03-17
湖北省路桥集团有限公司
View PDF14 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to solve the problems of high cost and poor stability of the tower end hanging and beam end anchoring operation platform in the traditional cable-stayed cable construction, and innovate the cable tower top lifting traction operation platform and beam end anchoring traction operation platform, Formation of a new installation system and construction method for cable tower cable stays

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of cable bent tower stay cable installation system
  • Construction method of cable bent tower stay cable installation system
  • Construction method of cable bent tower stay cable installation system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0040] In the description of the present invention, it should be understood that the terms "opening", "upper", "middle", "length", "inner", etc. indicate orientation or positional relationship, and are only for the convenience of describing the present invention and simplifying the description , rather than indicating or implying that the components or elements referred to must have a particular orientation, be constructed and operate in a particular orientation, an...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction method of a cable bent tower stay cable installation system, and relates to the technical field of bridge engineering. The construction method comprises the following steps: 1, mounting a tower top embedded component; 2, mounting an upper bracket of a tower top lifting traction operation platform; 3, mounting a beam end pressure anchor traction operation platform; 4, carrying out tower top cable hanging; 5, performing beam end anchor pressing; and 6, disassembling the construction platform. The construction method solves the problem that large hoisting equipment cannot be installed due to limited tower top space, connects a support system of an operation platform through embedded components, and mounts a power device, thus solving lifting and tractionof stay cables; compared with hoisting measures such as mounting a tower crane or a bracket, the cost investment and the time cost are saved; and the two parallel rails are arranged on the beam faceand used for advancing of the operation platform traction frame, so that the position of the operation platform can be adjusted at any time, and the operation platform can be flexibly placed in place,and the construction efficiency is improved.

Description

technical field [0001] The invention belongs to the technical field of bridge engineering, and in particular relates to a construction method for a cable-stayed cable installation system of a cable tower. Background technique [0002] The stay cable is a load-bearing component with one end hung on the top of the tower and the other end anchored on the bridge beam. Therefore, in the installation and construction of the stay cable, it mainly includes 1. Two parts of the anchorage construction of the stay cables on the bridge girder body. At present, tower ends of cable-stayed cables are mostly hung with large-scale mechanical equipment such as tower cranes. The usual practice is to install tower cranes or brackets next to the main tower to complete the hoisting of cable-stayed cables, the entry, assembly, and erection of brackets for mechanical equipment, etc. Both require a lot of time and are expensive. At the same time, if the main tower of the bridge is located in Hanoi ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00E01D11/04E01D101/30
CPCE01D11/04E01D21/00E01D2101/30
Inventor 旷新辉秦海涛李凡谢东升何志红
Owner 湖北省路桥集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products