Construction method of karst geological cast-in-place piles
A construction method and cast-in-place pile technology are applied in sheet pile walls, foundation structure engineering, construction, etc. to achieve the effects of easy disassembly, improved stability, and easy stress.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0041] The present invention will be further described below in conjunction with the examples. The description of the following examples is provided only to aid the understanding of the present invention. It should be pointed out that for those skilled in the art, without departing from the principle of the present invention, some improvements and modifications can be made to the present invention, and these improvements and modifications also fall within the protection scope of the claims of the present invention.
[0042] The construction method of the karst geological filling pile comprises the following steps:
[0043] (1) Carry out surveying and setting out and pile hole positioning according to the advanced geological forecast.
[0044] (2), excavate the earthwork of the first section pile hole, and pour the standard section retaining wall 28 . The excavation depth is 1m. First excavate the earthwork in the middle of the pile hole, then expand the excavation to the per...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com