A plant organic combination compound ecological slope protection and its construction method
A technology of ecological slope protection and construction method, which is applied in botany equipment and methods, plant cultivation, construction, etc., to achieve the effects of strong water erosion resistance, convenient construction, and reduced area
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] River bank slope protection is an amphibious ecosystem between land and water. It is often affected by the fluctuation of water level. The erosion is particularly serious in the transitional stage of water and land. It has caused large-scale soil erosion for a long time, and it is more difficult for vegetation to take root. The ecosystem has been severely damaged. Especially in the middle and upper reaches of rivers with turbulent water flow and many deposited sand and pebbles, the plant seeds in the water level fluctuation zone are easily washed and lost by the water flow, so that the plants cannot survive in large areas, and the vegetation cannot be effectively artificially restored. The water that plays a key role in the ecosystem - The transition zone of land connection is destroyed and cannot exist stably for a long time.
[0026] Existing slope protection such as geocell slope protection has good greening effect, increased drainage performance, fast construction, ...
Embodiment 2
[0036] The present embodiment provides a kind of construction method of plant organic combination complex ecological slope protection, such as Figure 5 As shown, firstly, the river channel that needs to be laid with ecological slope protection is intercepted, and then based on the inclined bank slope 1 on both sides of the river channel, formwork 9 is laid at intervals along the inclined surface of bank slope 1, and the distance between every two adjacent formworks is 4m. A pouring area 10 is formed between the two formworks, and then according to the area of the pouring area, the water-cement ratio is 1.0-1.4, and the amount of cement is 50kg-70kg / m 3 , The amount of fly ash is 60% to 70% of the amount of cement, and the cemented sand and gravel material with a porosity of not less than 15% is stirred. After the stirring is completed, it is poured from bottom to top in the pouring area and manually vibrated and leveled to form a gel. Sand and gravel layer 2, the laying met...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com