Multi-connected-body truss integral elevating reverse work construction system and method
A technology of overall lifting and construction method, applied in the direction of load hanging components, construction, transportation and packaging, etc., can solve the problems of difficult connection of components, high risk, and inability to guarantee welding quality, shortening the construction period and improving the installation quality. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028]A construction method for overall lifting and reverse construction of a multi-channel connected truss proposed by the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. The advantages and features of the present invention will become clearer from the following description. The technical content and features of the present invention will be described in detail below by referring to the illustrated embodiments in conjunction with the accompanying drawings. It should be further noted that all the drawings are in very simplified form and use imprecise scales, and are only used to facilitate and clearly assist the purpose of illustrating the embodiments of the present invention. For the convenience of description, the "up" and "down" described below are consistent with the directions of up and down in the drawings, but this should not be a limitation of the technical solution of the present inven...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


