Construction method for C type stock ground upper structure
A construction method and material yard technology, applied in the field preparation of building components, building components, industrial buildings, etc., can solve problems such as long construction period, many safety hazards, and difficult construction, so as to improve construction efficiency and ensure construction quality effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The present invention is further illustrated by specific examples below.
[0027] A construction method for the upper structure of the retaining wall of the C-type stockyard, such as Figure 1~3 As shown, including the following steps:
[0028] (1) Construction preparation;
[0029] (2) Construction zone
[0030] On the basis of the design expansion joints of the middle retaining wall, a number of construction joints are set up to divide the upper structure of the stockyard into 12 construction areas. The length of each construction area is between 30-50m. Each construction area includes the middle retaining wall, Transverse partition walls and longitudinal low walls are constructed according to the determined construction area. The construction of 1, 3, 5, 7, 9, 11 is carried out first, and then 2, 4, 6, 8, 10, 12 area;
[0031] (3) Construction of intermediate retaining wall
[0032] First construct the intermediate retaining wall in each construction area, and divide the int...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com