Virtual machine online migration method based on hardware acceleration
A hardware acceleration and virtual machine technology, applied in software simulation/interpretation/simulation, program startup/switching, resource allocation, etc., can solve problems such as performance degradation, dirty memory pages, inflexible working set size, etc., to eliminate time The effect of consumption and cost reduction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0102] figure 1 It shows the process of efficient virtual machine migration based on load perception in this example. The process mainly includes 6 major steps. In the first four steps, the virtual machine runs on the source physical host, and these four steps are collectively referred to as the pre-copy stage. After a brief pause in step 5, the virtual machine will run on the destination host. Therefore, step 6 is called the post-copy stage. A method for online migration of a virtual machine based on hardware acceleration includes the following steps:
[0103] S101. Workload Profiling
[0104] In this embodiment, the user initiates a migration request, which marks the start of the migration work. The system will enter step S101 to perform load analysis. In this step, the migration system tracks the memory and disk access sequences of the virtual machine, and predicts the working set (of disk and memory) according to the acquired data. S101 is divided into four parts, f...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


