Power transmission line patrol operation work order intelligent management method and system

A technology for power transmission lines and intelligent management, which can be used in electrical digital data processing, information technology support systems, energy-saving computing, etc., and can solve problems such as high energy consumption.

Active Publication Date: 2020-09-04
GUANGDONG POWER GRID CO LTD +1
View PDF9 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] The present invention provides an intelligent management method and system for inspection work orders of power transmission lines in order to overcome the current technical defects of relying on manual management of work orders for patrol work.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power transmission line patrol operation work order intelligent management method and system
  • Power transmission line patrol operation work order intelligent management method and system
  • Power transmission line patrol operation work order intelligent management method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0098] Such as figure 1 As shown, a transmission line inspection work order intelligent management method includes the following steps:

[0099] S1: The work order generator obtains data from the database to generate inspection work orders;

[0100] S2: The operation and maintenance personnel review the inspection work order and send the approved inspection work order to the messager;

[0101] S3: The messenger forwards the approved inspection work order to the RPA robot;

[0102] S4: The RPA robot simulates the manual entry process to enter the inspection work order, and calls the communication equipment to notify the operation and maintenance personnel.

[0103] During the implementation process, the inspection work order is automatically generated by calling the data through the work order generator, and then the RPA robot replaces the manual entry into the production management system of the power grid to realize the intelligent management of the transmission line inspec...

Embodiment 2

[0173] Such as Image 6 As shown, a system applying the above method includes a database, a work order generator, a messager, an RPA robot, a production management system and a communication device;

[0174] The database includes special section database, line account database, personnel equipment database, management and control level database, operation and maintenance strategy database, intelligent equipment installation database, group defense personnel database, power grid risk and power supply record database, meteorological database and problem database;

[0175] Special section database, line account database, personnel equipment database, management and control level database, operation and maintenance strategy database, intelligent equipment installation database, group defense personnel database, power grid risk and power supply record database, meteorological database and problem database are all related to work orders The generator is electrically connected; the o...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a power transmission line patrol operation work order intelligent management method. The method comprises the following steps that S1, a work order generator obtains data from adatabase to generate a patrol operation work order; s2, the operation and maintenance personnel audits the inspection operation work order and sends the inspection operation work order passing the auditing to a message device; s3, the message device forwards the inspection operation work order passing the auditing to the RPA robot; and S4, the RPA robot simulates a manual input process to input the inspection operation work order, and calls communication equipment to inform operation and maintenance personnel. The invention also provides a power transmission line patrol operation work order intelligent management system. The system comprises a database, a work order generator, a message device, an RPA robot, a production management system and communication equipment. The power transmission line patrol operation work order intelligent management method and system solve the technical defect that a lot of energy is consumed because the patrol operation work order is manually managed at present.

Description

technical field [0001] The present invention relates to the technical field of transmission line operation and maintenance, and more specifically, to an intelligent management method and system for transmission line inspection work orders. Background technique [0002] High-voltage transmission lines are distributed in many places, and the daily operation and maintenance of transmission lines is important and arduous. In recent years, with the rapid economic development, the demand for power supply has also increased year by year, the grid structure has been continuously improved, the scale of transmission lines has also continued to expand, and customers have continuously increased requirements for power supply reliability. Therefore, the company has higher and higher requirements for equipment operation and maintenance. more and more detailed. According to the latest operation and maintenance strategy requirements, line operation and maintenance must follow the following ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/00G06Q10/10G06Q50/06G07C1/20G06F16/2458
CPCG06Q10/20G06Q10/109G06Q50/06G07C1/20G06F16/2465Y04S10/50Y02D10/00
Inventor 曾懿辉任欣元胡壮丽张纪宾麦俊佳
Owner GUANGDONG POWER GRID CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products