A positioning method and positioning system for in-situ construction of steel truss beams
A positioning method and technology of steel truss girder, applied in bridges, truss bridges, bridge construction and other directions, can solve problems such as large installation errors, inaccurate positioning, errors, etc., achieve accurate positioning, increase safety, and facilitate monitoring and control. The effect of adjustment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0061] The positioning method and positioning system for in-situ construction of steel truss girders in Embodiment 1 of the present invention are used for the construction of steel truss girders that span existing railways and the surrounding terrain is complex. During construction, a sliding support is installed on one side of the longitudinal bridge direction. Two slideway beams are installed on the sliding support, and the slideway beams are respectively connected to the center of the adjacent pier caps. The positioning method for in-situ construction includes the following steps: S1. Install two slideway beams on the sliding support, and monitor the positioning of the slideway beams: set a contour benchmark under the slideway beams, The contour datum is the second reflective plate of the horizontal contour installed on the sliding bracket, and the first distance measuring sensor is installed on the slideway beam, and the first distance measuring sensor is a laser distance m...
Embodiment 2
[0077] Example 2 of the present invention is the construction of 1-(120+82)m steel truss girders on piers No. 31-33 of the Qingrong Railway Extra Large Bridge on the Weilai Right Line, which belongs to the construction of extra-large bridges. Due to the crossing of the existing railway, the construction site environment is complex , it is designed to install a sliding support 2 on one side of the longitudinal bridge direction. Two slideway beams 1 are installed on the sliding support 2. The slideway beams 1 are respectively connected to the center of the adjacent pier cap, and the steel truss girder is along The slideway beam 1 is moved laterally and placed in place. Therefore, during the construction process, the positioning method of the steel truss beam in place construction includes the following steps:
[0078]S1. Install two slideway beams 1 on the sliding support, and monitor the positioning of the slideway beams 1: set a contour benchmark below the slideway beam 1, and ...
Embodiment 3
[0095] Embodiment 3 of the present invention provides a positioning system for in-situ construction of steel truss girders, including: a main control module, the main control module is respectively connected with the slideway beam installation positioning module, the steel truss girder transfer positioning module, and the steel truss girder lateral movement The positioning module, the steel truss girder drop beam positioning module, and the steel truss girder drop beam in-position positioning module communicate with each other;
[0096] The slideway beam installation and positioning module is used for positioning the slideway beam installation position. The slideway beam installation and positioning module includes a first distance measuring sensor and a second reflector, and the first distance measurement sensor measures the distance from the second reflector. transmit the value to the master control system;
[0097] The steel truss girder transfer and positioning module is u...