A steel bridge deck pavement structure
A steel bridge deck and pavement technology, applied in bridges, bridge construction, bridge parts, etc., can solve problems such as poor low temperature cracking resistance, achieve excellent wear resistance and bending resistance, ingenious structure, excellent and high stability and the effect of resistance to deformation under load
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] A steel bridge deck pavement structure, such as figure 1 , figure 2 and image 3 As shown, it includes an anti-corrosion layer 2, an elastic transition layer 3, a polymer prefabricated profile layer 4 and an anti-skid layer 5 laid sequentially on the steel bridge deck 1 (steel plate), between the elastic transition layer 3 and the polymer prefabricated profile layer 4 There is an adhesive layer (not shown in the figure) between them; the elastic transition layer 3 and the anti-skid layer 5 both adopt an integrated structure, and the specification of the single polymer prefabricated profile layer 4 is 6-12 meters long and 1-1.8 meters wide , the adjacent polymer prefabricated profile layers 4 are connected by overlapping or clamping, and the surfaces of all the polymer prefabricated profile layers 4 after connection are located on the same plane.
[0024] Among them, the elastic transition layer 3 is prepared by blending reactive resin and filler with a particle size ...
Embodiment 2
[0032] A kind of steel bridge deck pavement structure, referring to embodiment 1 and combining Figure 4 As shown, its main difference from Example 1 is that the anti-skid layer 5 adopts a 5mm thick modified methacrylic resin layer; the polymer prefabricated profile layer 4 is a prefabricated hollow profile layer using modified ASA, and its thickness is 40mm 1. The hollow rate is 30%, and the holes corresponding to the hollow parts are round holes; the thickness of the elastic transition layer 3 is 15mm.
Embodiment 3
[0034]A kind of steel bridge deck pavement structure, with reference to embodiment 1, its main difference with embodiment 1 is: antiskid layer 5 adopts the modified methacrylic resin layer with 6mm thickness; Macromolecule prefabricated profile layer 4 adopts PA alloy The prefabricated hollow profile layer has a thickness of 30mm and a hollow rate of 70%, and the holes corresponding to the hollow parts are square holes; the thickness of the elastic transition layer 3 is 12mm.
[0035] In the remaining embodiments, refer to Embodiment 1, wherein: the thickness of the anti-corrosion layer can be selected within the range of 0.05-0.8mm, the thickness of the elastic transition layer can be selected within the range of 5-10mm, and the thickness of the polymer prefabricated profile layer can be selected within the range of 30-35mm The thickness of the anti-skid layer can be selected within the range of 4-6mm; the polymer prefabricated profile layer can also be made of PVC alloy.
[...
PUM
| Property | Measurement | Unit |
|---|---|---|
| particle diameter | aaaaa | aaaaa |
| particle diameter | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



