Precise control construction method for 3D fabrication and installation of embedded part in large deep foundation pit column
A technology for embedded parts and deep foundation pits, which can be used in infrastructure engineering, architecture, building construction, etc., and can solve problems such as deviation of embedded parts
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0011] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0012] see Picture 1-1 , the present invention provides a technical solution: a precise control method for 3D fabrication and installation of embedded parts in large deep foundation pit columns, which has the advantage of precise construction and solves the problem of deviation of embedded parts.
[0013] In order to solve the above technical problems, the present invention provides the following technical solutions: a 3D three-dimensional production and inst...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com