Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Electric vehicle charging and discharging scheduling method based on consideration of average discharging rate

A technology of electric vehicles and dispatching methods, applied in computing, combustion engines, internal combustion piston engines, etc., can solve problems such as battery loss without in-depth consideration, and achieve the effect of ensuring safety

Active Publication Date: 2020-10-02
国家电网有限公司西南分部
View PDF4 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0008] Aiming at the above-mentioned deficiencies in the prior art, the invention provides a charging and discharging scheduling method for electric vehicles based on the average discharge rate, which solves the problem that the prior art only conducts charging and discharging scheduling for the needs of the power grid or the user side, and does not deeply consider the electric vehicle charging and discharging. The problem of battery loss when the car is charged and discharged

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Electric vehicle charging and discharging scheduling method based on consideration of average discharging rate
  • Electric vehicle charging and discharging scheduling method based on consideration of average discharging rate
  • Electric vehicle charging and discharging scheduling method based on consideration of average discharging rate

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] The specific embodiments of the present invention are described below so that those skilled in the art can understand the present invention, but it should be clear that the present invention is not limited to the scope of the specific embodiments. For those of ordinary skill in the art, as long as various changes Within the spirit and scope of the present invention defined and determined by the appended claims, these changes are obvious, and all inventions and creations using the concept of the present invention are included in the protection list.

[0042] Such as figure 1 As shown, a charging and discharging scheduling method for electric vehicles based on the average discharge rate includes the following steps:

[0043] S1. Collect the EV information connected to the network through the smart charging device, and process and screen the EV information to obtain the dispatchable vehicle information;

[0044] The step S1 includes the following sub-steps:

[0045] S11....

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an electric vehicle charging and discharging scheduling method based on consideration of an average discharging rate, and the method comprises the following steps: S1, collecting EV information of network access through an intelligent charging device, and carrying out the processing and screening of the EV information, and obtaining schedulable vehicle information; s2, establishing a first-stage optimization model; s3, obtaining optimized payment cost and average discharge rate indexes according to the first-stage optimization model and the constraint conditions of thefirst-stage optimization model; s4, taking the optimized payment cost and the average discharge rate index as constraint conditions, and establishing a second-stage optimization model; s5, collectingpower grid information and schedulable vehicle information through a cluster agent, and inputting the power grid information and schedulable vehicle information into the second-stage optimization model for scheduling optimization to achieve EV vehicle scheduling. The method solves the problems that in the prior art, charging and discharging scheduling is only carried out for power grid or user side requirements, and battery loss is not deeply considered when charging and discharging arrangement is carried out on the electric vehicle.

Description

technical field [0001] The invention relates to the field of electric power system planning, in particular to a charging and discharging scheduling method for electric vehicles based on taking into account the average discharging rate. Background technique [0002] In the context of energy shortage and environmental pollution issues, large-scale network access of efficient and clean electric vehicles will be an inevitable trend in the future. Due to its flexibility and energy storage characteristics after clustering, electric vehicles have a strong potential for demand response in the grid, and can realize two-way interaction between electric vehicles and the grid (Vehicle to Grid, V2G). Under reasonable scheduling, it can It can help the power grid to alleviate the power load, cut peaks and fill valleys, and can also provide auxiliary services such as frequency regulation and backup for the power grid. How to formulate a reasonable scheduling strategy is a key point in the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/06
CPCG06Q10/04G06Q10/067G06Q50/06Y02T10/40
Inventor 蔡绍荣魏明奎周全路亮江栗王庆李怡然张姝肖先勇
Owner 国家电网有限公司西南分部
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products