A kind of advance grouting support method for advance support small conduit and deep soft rock roadway
A technology of advanced support and small conduits, applied in tunnels, earthwork drilling, tunnel linings, etc., can solve problems such as brittle failure, achieve the effects of increased friction, improved support strength, and improved tensile strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] refer to Figure 1-2 , this embodiment provides a small advanced support conduit, including a hollow conduit body, the end of which has a grouting port for grouting, the head end has a jacking portion, and along the length direction of the conduit body is provided with The overflow hole 4 communicated with its inner hollow part; at least one section of the duct body is a curved pipe body 1; the end of the duct body is coaxially provided with a blocking tray 8, and the blocking tray extends around its radial direction into a tray shape; The part and the conduit body are inserted into the roadway wall in turn, the slurry is injected into the conduit body through the grouting port 3 and overflows into the roadway wall from the overflow hole 4, and the blocking tray 8 is closely attached to the roadway wall to prevent the rock and soil slump of the roadway wall and the slurry Seepage out of the roadway wall, and the slurry solidifies in the roadway wall to form the support ...
Embodiment 2
[0052] see Figure 3-4 , the present embodiment provides a method for advanced grouting support for deep soft rock roadways, using the advanced support small conduit as described in Embodiment 1 for advanced grouting support before excavation of deep soft rock roadways , the method includes the following supporting construction steps:
[0053] S1: Determine the construction point with a high risk factor of easy collapse on the deep soft rock roadway to be excavated, and mark multiple control points on the radial section of the roadway where the construction point is located;
[0054] S2: Drill a hole at the control point, and drive the small advanced support conduit into the roadway wall through the hole;
[0055] S3: prepare slurry, inject the slurry into the small advanced support conduit through the grouting port 3, and inject the slurry into the roadway wall through the slurry overflow hole 4;
[0056] S4: After grouting is completed, screw the locking part, lock the blo...