Shield receiving construction method and receiving tunnel door water stop device
A construction method and technology of shield tunneling, which are applied in vertical shaft equipment, earthwork drilling, wellbore lining, etc., can solve problems such as shortening construction period, gushing water and sand, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0052] The present invention will be further described below in conjunction with drawings and embodiments. attached Figure 1 to Figure 22 The drawings for the embodiments are drawn in a simplified manner and are only used for the purpose of clearly and concisely illustrating the embodiments of the present invention. The following technical solutions shown in the drawings are specific solutions of the embodiments of the present invention, and are not intended to limit the scope of the claimed invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.
[0053] In the description of the present invention, it should be understood that the orientations or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "left", "right" etc. are based on those shown in the accompanying drawings. Orientation...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


