Production equipment for processing wall panels and processing method for wall panels
A technology for production equipment and fence, applied in the field of production equipment for processing fence panels, can solve the problems of high labor cost, cumbersome operation of workers, cumbersome use, etc., and achieve the effects of reducing work intensity, facilitating use and improving work efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0021] Such as figure 1 Shown is a kind of production equipment for processing wall panels, including mold assembly 1 including side formwork 11, front formwork 12, rear formwork 13 and bottom formwork 14, forming between side formwork 11, front formwork 12, rear formwork 13 and bottom formwork 14 There is a molding area 15, the rear formwork 13 and the bottom formwork 14 are integrally structured, the back formwork 13 and the bottom formwork 14 are L-shaped, the side formwork 11 and the rear formwork 13 are connected by hinges 16; There is a first connection assembly 2, the bottom formwork 14 and the front formwork 12 are connected through the first connection assembly 2, and the front formwork 12 can rotate around the first connection assembly 2, and the first connection assembly 2 includes a mounting beam 21, a connection plate 22 and a second A rotating shaft 23, the mounting beam 21 is provided with several groups, the mounting beam 21 is arranged on the side of the botto...
Embodiment 2
[0027] A processing method of the wall panel obtained according to the production equipment for processing the wall panel described in embodiment 1:
[0028] Include the following steps:
[0029] Step 1: Connect the side formwork 11, the front formwork 12, the rear formwork 13 and the bottom formwork 14 through the first connection assembly 2, the second connection assembly 3 and the third connection assembly 4 respectively;
[0030] Step 2: Pour the concrete into the mold forming area 15, stir while pouring to reduce air bubbles, fill up and scrape the overflowing concrete;
[0031] Step 3: When the concrete is half dry, insert the hook above the concrete;
[0032] Step 4: After the concrete is completely dry, untie the second connection assembly 3 and the third connection assembly 4, turn the front formwork 12 outward around the first connection assembly 2, and turn the side formwork 11 outward around the hinge 16 to form The surrounding wall panels are exposed, and finall...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


