Steel-structure external wall dry hanging integrated board and installation method
A steel structure and integrated panel technology, applied in walls, building components, building structures, etc., can solve the problems of cumbersome assembly and disassembly of connectors and embedded parts, affecting the transportation and installation of external wall hanging panels, and low efficiency. Achieve the effects of improving connection strength and connection reliability, improving construction efficiency, and reducing assembly and disassembly steps
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] Such as figure 1 As shown, a dry-hanging integrated panel for the exterior wall of a steel structure includes a prefabricated exterior wall hanging panel 1 and a connecting component used in conjunction with it. The side of the prefabricated exterior wall hanging panel 1 opposite to the steel structure is embedded with a prefabricated beam 2, and the prefabricated beam 2 is prefabricated with an inwardly recessed installation groove 3. The connecting assembly includes a base 4, a connecting piece 5 and an angle adjustment structure. The base 4 is fixedly connected to the outer wall column of the steel structure by bolts, and one end of the connecting piece 5 is connected through a rotating shaft. On the base 4, the other end of the connector 5 is provided with an integrally connected raised part 51 and a guide part 52, the angle adjustment structure is installed on the base 4, and the connector 5 under the action of the angle adjustment structure enters the installation ...
Embodiment 2
[0045] A method for installing a dry-hanging integrated panel on an exterior wall of a steel structure, comprising the following steps:
[0046] A. First fix the base 4 in the connection assembly on the outer wall column of the steel structure;
[0047] B. Then use the hoisting equipment to hoist the prefabricated exterior wall hanging plate 1 to the position where the prefabricated beam 2 and the rotating node of the connecting piece 5 are located on the same horizontal plane;
[0048] C. Adjust the connecting plate 6 to drive its own angle control part 61 to move to the side close to the limit plate 7. During this process, the guide part 52 of the connecting part 5 will guide the end of the connecting part 5 away from the base 4 to gradually insert into the installation groove 3 , when the limiting plate 7 fits with the angle control part 61, the raised part 51 cooperates with the installation groove 3 and the positioning part 53 on the top of the raised part 51 cooperates w...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com