Production process of low-voltage fuse and low-voltage fuse
A production process and fuse technology, which is applied in the field of low-voltage protection fast fuse and its production process, can solve the problems of high connection process requirements and reduced product flow performance, and achieves simple process, suitable for mass production, and avoids mechanical problems. The effect of joining or welding
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0051] This embodiment provides a low-voltage fuse, see Figure 1-Figure 8 , is a structural schematic diagram of the fuse of this embodiment, wherein the fuse includes: a housing 1, which is a hollow tubular structure with two ends open, the housing 1 includes a first end 14 and a second end 15, the second The side wall of one end 14 is symmetrically provided with two card slots 13, the side wall of the second end 15 is symmetrically provided with two card slots 13, and the second end 15 is also provided with at least one arc opening 16 for welding; The low-voltage fuse also includes two terminals 3, which are respectively assembled at both ends of the housing 1. A boss 32 is respectively provided on the two sides of the terminal 3, and the terminal 3 is clamped on the card of the housing 1 through the boss 32. Groove 13, in order to realize the precise positioning of terminal 3; Melt 4, one end of melt 4 is welded with a terminal 3 to form a melt terminal assembly, melt term...
Embodiment 2
[0067] This embodiment provides a production process for the fuse described in Embodiment 1, see Figure 9 , is the process flow diagram of the present embodiment, wherein the production process comprises steps:
[0068] S1. Provide a hollow shell with openings at both ends, and the side walls at both ends of the shell have respectively symmetrically arranged card slots, and provide a shell with bosses on both sides and a mounting part formed at one end terminal;
[0069] S2. A melt is provided, and one end of the melt is welded to a mounting portion of the terminal to form a melt terminal assembly;
[0070] S3. Assembling the melt terminal assembly to one end of the housing, and locking the boss of the terminal in the slot of the housing to achieve precise positioning;
[0071] S4. Assemble the other terminal to the other end of the housing, and engage the boss of the terminal in the slot of the housing to achieve precise positioning; the melt is on the housing The other e...
Embodiment 3
[0076] The low-voltage fuses assembled in Embodiment 1 or Embodiment 2 were used for performance testing, and the arc extinguishing time was shortened to 22 ms by comparison with the minimum breaking test.
[0077] However, when the bosses 32 are not provided on both sides of the terminal 3, the arc extinguishing time is 200 ms.
[0078] That is, the assembled low-voltage fuse in Embodiment 1 or Embodiment 2 can effectively shorten the arc extinguishing time, thereby improving product performance.
[0079] Among them, the minimum breaking test is carried out according to the standard of GB13539-1-2015.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


