Development resource integrated scheduling method for high-end equipment complex hierarchical task network
A task network and equipment technology, applied in the field of research and development resource integration scheduling, can solve problems such as low utilization efficiency of research and development resources, and achieve the effect of solving low utilization efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0067] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.
[0068] The embodiment of this application solves the technical problem of low utilization efficiency of development resources in existing scheduling methods by providing an integrated scheduling method for development resources oriented to complex hierarchical task networks for high-end equipment, and effectively supports multi-type development resources in projects. Integrated scheduling of aircraft models improves the utilization...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com